| |
|
|
|
Projects Experience :
- OPERATION AND MAINTENANCE OF PROCESS PLANTS (OFFSHORE & ONSHORE)
| No. |
Clients |
Job Description |
| 1 |
Command Petroleum India Pty Ltd. (Presently owned by Cairn Energy India Pty. Ltd.) |
Operation and maintenance of offshore platforms and onshore oil and natural gas processing and oil storage facility. |
| 2 |
Punj Lloyd Limited |
Commissioning, operation and maintenance of Dandewala Gas Processing Complex and commissioning of Tanot Gas Gathering Complex. |
| 3 |
Hitech Drilling Services India Limited |
Engineering and execution of repair / upgradation of 'TAHARA' floating production facility. |
| 4 |
Hydrocarbon Resources Development Co. (P) Ltd. |
Design, fabrication, operation and maintenance of process facility at Sanganpur oil field in Mehasana. |
| 5 |
Heramec Limited |
Start up and operation maintenance of Dholasan and Allora oil field. |
- PIGGING, HYDROTESTING AND OTHER PIPELINE SERVICES
| No. |
Clients |
Job Description |
| 1 |
Essar Gujarat Limited |
Hydrostatic testing of 11 offshore platform pipelines of ONGC, BRBC's WIPPM. |
| 2 |
Chembur Patalganga Pipeline Ltd. |
Hydrostatic testing of 8" Product Pipeline from Chembur to Patalganga. |
| 3 |
Reliance Petroleum Limited |
Detailed engineering and execution of pigging operation at Jamnagar Refinery Complex. |
| 4 |
Haldia Petrochemicals Limited |
Detailed engineering and execution of pigging operation job at Haldia Petrochemical Complex. |
| 5 |
Indian Oil Corporation Ltd. |
Conversion of 14" / 12" pipelien between Hay Bunder to IOC Terminal. |
| 6 |
Gujarat Chemical Port Terminal Co. Ltd. |
Engineering and modification of all the jetty to plant pipelines to make them piggable and execute pigging operation. |
| 7 |
Hindustan Storage & Distribution Co. Ltd. |
Modification of 10" line to pigable line from jetty to terminal. |
| 8 |
Hikel Chemical Industries Ltd. |
Pigging of brine supply and return header using poly pigs. |
| 9 |
Consolidated Engineer Const. Co. |
Hydrotesting and pigging of 14" NB bitumen line. |
| 10 |
Arun Fabricator |
Hydrotesting and pigging of 14" NB bitumen line. |
| 11 |
TDW India Ltd. |
Caliper survey and pigging of pipeline. |
| 12 |
Indian Petrochemicals Limited |
Design and fabrication of corrosion monitoring system. |
| 13 |
Reliance Petroleum Limited |
Flushing and commissioning of Hydraulic Control System. |
| 14 |
Reliance Petroleum Limited |
Hydrostatic testing of 48" dia., 39.7 Km long crude oil pipeline. |
| 15 |
Tubesstra Ltd. |
Pigging of offshore pipelines at Bombay High. |
| 16 |
Haldia Petrochemicals Ltd. |
Conversion of 8", 6.25 Km long line from Benzene to Hexane. |
| 17 |
State trading Corporation |
Engineering and modification of 12" NB twin pipelines from jetty to terminal to make them pigable and execute pigging operation. |
| 18 |
British Gas E&P |
Annual contract for pigging offshore hydrocarbon lines. |
| 19 |
Cairn Energy India Pty. Ltd. |
Pigging of 24", 35 Km gas line. |
| 20 |
Haldia Petrochemicals Ltd. |
Carry out pigging of 8", 10 Km long Butadiene line. |
| 21 |
Reliance Industries Ltd. |
Pigging of 16", 1 Km long coker plant line. |
| 22 |
Reliance Industries Ltd. |
Pigging of 6" distillate & Gas Oil lpipeline 4 Kms long |
| 23 |
Indian Oil Corporation Ltd. |
Hydrotetsting of 12" Supply Oil Pipeline 6 Kms long between Haybunder & Wadala Depot |
- DRILLING, WELL COMPLETION, WORKOVER AND WELL TESTING OPERATION
| No. |
Clients |
Job Description |
| 1 |
QGPC, Doha, Qatar |
Well completion, workover operations and supervision of wireline and production testing operations in the offshore fields of North Dome, Buk Hanine, Maydam Mazham, Idd-el-Shargi. |
| 2 |
CDC, Doha, Qatar |
Well testing operations in the offshore fields of North Dome, Buk Hanine, Maydam Mazham, Idd-el-Shargi. |
| 3 |
Specialised Oil Services, Doha, Qatar |
Well testing operations in the offshore fields of North Dome, Buk Hanine, Maydam Mazham, Idd-el-Shargi. |
| 4 |
Hindustan Oil Exploration Co. Ltd. |
Well testing operation on Palej-4. |
| 5 |
Hindustan Oil Exploration Co. Ltd. |
Well testing operation on Pramoda-1. |
| 6 |
Great Eastern Energy Corporation Ltd. |
Well testing operation of CBM wells in Ranigunj belt of West Bengal. |
| 7 |
Reliance Industries Ltd. |
Consultancy services for offshore well testing and completion services. |
| 8 |
Gujarat State Petroleum Co. |
Consultancy and execution of offshore well testing and completion operation in KG basin. |
| 9 |
Essar Oil Ltd |
Well testing operation, Pressure & Temperature gradient survey, Downhole sampler study, Supervision & provision of personnels for testing, Detailed plan of testing. |
| 10 |
Prize petroleum Co. Ltd. |
Provision of 3 Phase seperator, Wax cutting cleaning, Pressure & Temperature gradient survey & recording, Pressure buildup study, Bottom hole test & study, Seperation of Oil Gas & Water, Supervision & provision of personnels for the above job. |
| 11 |
Hardy Oil Nigeria Ltd. |
Well testing at OZA Field Nigeria to be completed by August 2005 |
| 12 |
Hardy Oil Nigeria Ltd. |
Supply of Separators, Storage tank and all the required items with respect to well testing job. |
- ENGINEERING PROJECT MANAGEMENT AND CONSULTATION SERVICES
| No. |
Clients |
Job Description |
| 1 |
Hardy E&P India Inc. |
Preparation of workover, well stimulation, re-entry, completion and hook-up of PY-3 offshore oil field. |
| 2 |
Oil & Natural Gas Corporation Ltd. |
Carried out sub-sea drilling and well completion for the offshore wells in Bombay High. |
| 3 |
Hardy E&P India Inc. |
Carried out sub-sea drilling and well completions for PY-3 offshore oil field wells in Eastern Coast. |
| 4 |
Niko resources Ltd. |
Adequacy check for the gas gathering station at their land based drilling platform at Hazira. |
| 5 |
Hardy E&P India Inc. |
Front End Engineering for development plan of TR-A offshore oil field. |
| 6 |
Reliance Industries Ltd. |
Preparation of technical part of tender document for testing sixteen exploratory wells off East and West coast of India. |
| 7 |
Chennai Petroleum Corporation Ltd. |
Basic engineering for 48" crud oil line from SPM to Landfall point. |
| 8 |
TATA Petrodyne Ltd. |
Study on assessing market potential for natural gas along Surat-Mumbai National highway route and in Trombay area for the CB-OS-2 gas. |
| 9 |
Reliance Industries Ltd. |
Techno-economic study on development of well A1 in D-6 field by re-entry. |
| 10 |
Gujarat State Petroleum Corporation Ltd. |
Techno-economic study on developing Kanwara field in Gujarat. |
| 11 |
Hindustan Oil Exploration Co. Ltd. |
Engineering and project management for drilling and development of CB-ON-7 block (Palej). |
| 12 |
Hydrocarbon resources Development Co. (P) Ltd. |
Engineering and project management for work over of wells in Sanganpur block. |
| 13 |
Hydrocarbon resources Development Co. (P) Ltd. |
Engineering, project management, construction, installation and commissioning of Group Gathering Station and Tank Farm at Sanganpur 1 site for processing crude oil and gas. |
| 14 |
Hindustan Oil Exploration Co. Ltd. |
Front End Enginnering Design (FEED) for development of Palej-4 Early Production System. |
| 15 |
Semmon Consultant |
Preparation of scope of work and tender documents for LSTK contract. |
| 16 |
Oil & Natural Gas Corporation Ltd. |
Basic engineering for drilling and completion for G-1 and GS-15 fields in KG offshore of Rajahmundry asset. |
| 17 |
Selan Technologies Ltd. |
Engineering services on revival of Bakrol oil field. |
| 18 |
Hindustan Oil Exploration Co. Ltd. |
Project management and consultation services on development of PY-1 field. |
| 19 |
Great Eastern Shipping Co. Ltd. |
Consultancy services for viewing data of marginal blocks of ONGC and preparation of detailed report of all the 19 marginal blocks under offer by ONGC. |
| 20 |
Larsen & Toubro Ltd. |
Consultancy services for data viewing of the offshore marginal fields of ONGC and generation of reports based on data collected and recommendations on the fields. |
| 21 |
Hindustan Oil Exploration Co. Ltd. |
Augmentation of onshore facilities and drilling of a new well in the North Balol block. |
| 22 |
Great Eastern Energy Corporation Ltd. |
Consultancy and detailed engineering report on CBM gas exploration and development work. |
| 23 |
INTEC, Malaysia |
Basic Engineering for Drilling and Well Completion for ONGC's G-1 / GS-15 Project. |
| 24 |
Trenergy (Malaysia) Bhd |
Data Analysis of the offshore Marginal fields |
- PETROLEUM PRODUCTION & RESERVOIR ENGINEERING
| No. |
Clients |
Job Description |
| 1 |
Tata Industries Ltd. |
Geological and geophysical engineering review of oil field blocks. |
| 2 |
Hyundai |
Carried out studies on dual completion gravel pack for Tapti field and horizontal well completion design and a dual completion design for Panna and Mukta fields. |
| 3 |
Reliance India Ltd. |
Designed a conceptual development scheme for D-1. |
| 4 |
Essar Oil Ltd. |
Reservoir engineering studies including simulation in respect of Wasna, R-Series (R-7, R-9, R-13), Ratna and South Kadi. |
| 5 |
Hindustan Oil Exploration Company |
Interpretation of reservoir and production study data of Palej-4. |
|
|
|